中文
Products
LNG point supply integrated skid

Introduce


The LNG point supply integrated pry is used to fix and install storage tanks, gasifiers, pressure regulators, flow meters, pipelines, valves, instruments, and other equipment on one pry block in our factory. It has the characteristics of high integration, land saving, cost saving, easy installation, flexibility, safety and reliability, and easy operation.
On site, only the basic civil construction needs to be carried out according to the drawings provided by our party for the ground foundation. After the equipment arrives at the site, it can be lifted as a whole onto the foundation and used. At the unloading point, a metal rubber hose connected to the tank truck can be directly connected to the LNG tank truck. A matching flange is set at the equipment outlet to facilitate users to connect to the gas consumption point.


Classic case

  • Phone: 022-83945061
  • Email: okay_energy@163.com
  • website:www.okaytj.cn
  • Address: Phase 2, No. 12 Saida North 1st Road, Xiqing District, Tianjin
Copyright © 2019 - 2026 Euco Energy Technology (Tianjin) Co., Ltd. All Rights Reserve Record Number: Tianjin ICP Reserve No. 19011541-1
首页 电话 联系